BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20200128T233000Z
DTEND:20200129T003000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Alafia River Watershed Study Open House
DESCRIPTION:Hillsborough County is hosting a public meeting on Tuesday\, Jan. 28\, to present the preliminary floodplains within the Alafia River Watershed to the public. The County seeks to obtain valuable feedback from local residents that can be used to refine the updated watershed model and floodplain delineations.\n\nThe preliminary Alafia River Watershed Master Plan\, which covers about 260 square-miles in Hillsborough County\, provides an updated floodplain delineation\, level-of-service analysis for roadway flooding\, and stormwater project alternative analysis identifying future projects throughout the watershed that will help to address critical level-of-service deficiencies identified.\n\nThe County will present a series of floodplain mitigation projects developed with this update of the Alafia River Master Plan designed to reduce the extent/duration of historic flooding at key sites within the watershed. These projects are conceptual in nature and will potentially be added to the County's unfunded list for future projects.\n\nThe County's Watershed Management Plans are required to be updated in order to make complete and reliable information available to local and regional decision-makers\, and the development community. This project also will identify the 100-year floodplain across this watershed\, which will eventually be submitted to FEMA to update the existing Flood Insurance Rate Map (FIRM) panels containing this watershed.
X-ALT-DESC;FMTTYPE=text/html:<span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:10.0pt\;">Hillsborough County is hosting a public meeting on Tuesday\, Jan. 28\, to present the preliminary floodplains within the Alafia River Watershed to the public. The County seeks to obtain valuable feedback from local residents that can be used to refine the updated watershed model and floodplain delineations.<br />\nThe preliminary Alafia River Watershed Master Plan\, which covers about 260 square-miles in Hillsborough County\, provides an updated floodplain delineation\, level-of-service analysis for roadway flooding\, and stormwater project alternative analysis identifying future projects throughout the watershed that will help to address critical level-of-service deficiencies identified.<br />\nThe County will present a series of floodplain mitigation projects developed with this update of the Alafia River Master Plan designed to reduce the extent/duration of historic flooding at key sites within the watershed. These projects are conceptual in nature and will potentially be added to the County&rsquo\;s unfunded list for future projects.<br />\nThe County&rsquo\;s Watershed Management Plans are required to be updated in order to make complete and reliable information available to local and regional decision-makers\, and the development community. This project also will identify the 100-year floodplain across this watershed\, which will eventually be submitted to FEMA to update the existing Flood Insurance Rate Map (FIRM) panels containing this watershed.&nbsp\;&nbsp\;&nbsp\;<br />\n&nbsp\;</span></span></span><br />\n<br />\n&nbsp\;
LOCATION:Bloomingdale Regional Public Library - McLean Room 1906 Bloomingdale Ave\, Valrico FL\, 33596
UID:e.438.44185
SEQUENCE:3
DTSTAMP:20260414T161339Z
URL:http://riverviewchamber.chambermaster.com/events/details/alafia-river-watershed-study-open-house-44185
END:VEVENT

END:VCALENDAR
